Steel & Iron Table leg powder spraying line
1.Description:
Powder coating line spacialized design for painting mental doors. free design, overhead conveyor system,
speed adjustable. high output and automatic.
All the size and data can be designed by the requirements by the customer
Following data is one type line as a conference for customers:
2.Powder Coating line Components
1 |
Top-open Water Dry Oven |
1 set |
2 |
Powder Coating Curing Oven Tunnel |
1 set |
3 |
Curing Oven Heating - Diesel Burner with Heat Exchanger |
1 set |
4 |
Stainless Steel Powder Coating Booth |
1 set |
5 |
Recycle filter & cyclone |
1 set |
6 |
Auto Guns Powder Coating System ( 8 Guns) |
1 set |
7 |
CL-2000D Reciprocators |
1 set |
8 |
PLC Touch Screen Control |
1 set |
3. Design basis of Steel & Iron Table leg powder spraying line
Name of workpiece |
support legs for table, chair & desk |
Material of support legs |
steel & iron |
Max hanging size on each hanger |
L20mm×W50mm×H800mm |
Suggested interval between 2 hangers |
200mm |
Loading capacity on hanging hook |
≤30kg |
Output |
250-280pcs per hour |
Spraying method |
4 auto spray guns (match on 2 reciprocators) & 2 manual spray guns |
Heating source |
natural gas (Other choices are available: electricity, oil or coal) |
Conveying speed |
1m/min (Adjustable control) |
Pretreatment system |
Vertical shower type |
4.Process: Steel & Iron Table leg powder spraying line
If above parameters cannot meet with your strict coating need, please contact us for more detail.
We can make some adjustments or even improvements to suit your actual production conditions.
Pre-degreasing stage |
(50-65 Celsuis for 1 min) |
Degreasing stage |
(50-65 Celsuis for 2 mins) |
Rinsing stage |
(Room temperature for 1-2 mins) |
Surface conditioning stage |
(Room temperature for 1 min) |
Phosphating stage |
(35-45 Celsuis for 3 mins) |
Rinsing stage |
(Room temperature for 1-2 mins) |
Drying off oven to remove surface moisture |
(100-120 Celsuis for 10 mins) |
Powder curing |
(180-200 Celsuis for 20 mins) |
5.Process
powder coating Production Procedure:Pretreatment→Work Piece Loading→Drying→Automatic + Manual
Powder Coating → Powder Curing (25minutes, 180~200ºC) → Unloading
6.Details pic
Conveyor system
Pretreatment-spray shower
Multi cyclone spray booth:
Tunnel curing oven
Loading from our factory
7.We can supply different types line for many workpieces
8.please provide more details
In order to provide with advanced, practical, reliability, economy Powder coating line,
1. The max weight and size of the workpiece (L x W x H)? |
2. The spraying process requirement of the workpiece? |
3. The max production output per month or per year? |
4. The size of the production area (L x W x H)? Does it have the flat floor? |
5. The heating type you need: gas, oil, electric, biomass particle or coal? |
6. How many colors to be changed to spray per day? |
7. The powder spraying type: automatic, semi-automatic, or manual? |
8. The recovery mode: automatic, semi-automatic, or manual? |
9 . The pretreatment mode: groove, spray or sand blasting? |
10. The local electric voltage (V/P/Hz)? |
11. If you have the designated brand spare parts please let us know. |
9.Any question,just contact us!!!
More details
Miss Sonne Xie
Mobile: 0086-13396517032